Yoges Bapuji Mhatre

Instrumentation Engineer with 22 Yrs exp.
1325000 / year
July 13, 1981

About Candidate

Location

Education

B
B E Instrumentation 2024
VPM's MPCOE,Velneshwar-Guhagar,Ratnagiri. University of Mumbai

BE Instrumentation

D
Diploma in Instrumentation and Contol Engineering 2002
Govt. Polytechnic Pen.Dist-Raigad,Maharashtra. (MAharashtra State Board of Technical Education)

Diploma in Instrumentation and Contol Engineering

H
HSC Science 1998
G B Vader Highschool and Jr College,Pali.Dist-Raigad,Maharashtra.Mumbai Board

12th Science

S
SSC 1996
G B Vader Highschool and Jr College,Pali.Dist-Raigad,Maharashtra.Mumbai Board

10th

Work & Experience

D
Deputy Manager Instrumentation 01.01.2016 - Till Date
Aarti Pharmalabs Limited,Tarapur-Boisar,Dist-Palghar,Maharashtra.

Responsibilities: • Planning & executing Maintenance and Project schedules with documentation. • Preparation of BOQ and cost estimates. • Review of P&ID, data sheets. • Detailing and Instruments selection. • Procurement of Instruments. • Programming, Modification, Troubleshooting of Yokogawa DCS (Centum). • Assessing Software/Hardware modification/improvement requirements & implementing to PLC Systems/sub-control systems. • Monitoring and Maintenance of Lab Instruments. • Inspection and acceptance testing for procured materials. • Compliance of Legal requirements • Monitoring and Maintenance of ETP Online monitoring system. • Monitoring and Maintenance of STACK Online monitoring system. • Managing manpower, taking care of shift electricians, technicians and engineers. • Coordinating with other departments on a day-to-day basis for relevant jobs. • Providing guidance, training and motivating subordinates to ensure safe working and maintain discipline. • Identifying jobs for improvement of plant availability,safety and environment. • Interacting with clients,vendors to identify and implement latest techniques for increasing efficiency of the plant. • Preparing reference quotation,comparative statements,contractor negotiation,work orders & negotiating vendors. • Preparation of ISO, Safety related documents. • Working on SAP Projects Handled: • Installation and Commissioning of DES CDU Plant. • Installation and Commissioning of CAA Plant. • Installation and Commissioning of Mechanical vapor recompression (MVR) Plant. • Installation and Commissioning of Resin Plant. • Installation and commissioning of 12 TPH BD Boiler (IBL) • Installation and Commissioning of ETP ONLINE Monitoring System. • Installation and Commissioning of STACK ONLINE Monitoring System. • Installation and Commissioning of 10 TPH FBC Boiler (IBL). • Revamping of DM Water Plant with PLC. • Installation and Commissioning of Automated Peeler Centrifuge (GMP). • Installation and Commissioning of CFB Dryer. • Installation and Commissioning of Semi Continuous Hydrogenation Plant. • Installation and Commissioning of ATFE Plant. • Installation and Commissioning of MEE Plant.

S
Sr Officer Instrumentation 05.03.2010 - 31.08.20215
Sudarshan Chemical Industries Limited,Dhatav Roha.Dist-Raigad,Maharashtra.

Responsibilities: • Planning & executing Maintenance and Project schedules with documentation. • Troubleshooting, taking PLC program backup,monitoring online programme (PLC: Schneider M340, Premium, Micro, Tudo, SCADA, Indusoft, Vijeo Citect) • Time schedule and task of Instrument technicians and contractors • Calibration & maintenance of all Instruments • AC Drives (Yaskawa, ABB, Lenze, Telemecanique, Dandfos,Armtek) • Reviewing P&ID drawings, Instrument specifications, hook up diagrams,Instrument data sheet & Instrument loop drawings • Maintenance and observation of Fire Alarm system and PA( person addressing) system • Stamping of Weighing balance • Checking, removing & restoring safety interlocks • ISO documentation work including instruments calibration report, preventive maintenance & calibration, history report generation for the same • GMP (Good Manufacturing Practice) documentation work • Working on SAP Projects Handled: • Installation and Commissioning of 29 TPH FBC Boiler (Thermax) • Installation and Commissioning of 1 Megawatt Steam Turbine (Thermax) • Installation and Commissioning of ICE Plant (Kirloskar Compressor, 140 TR) • Installation and commissioning of Azo Pigment Plant. • Installation and commissioning of Mica GMP Plant. • Installation and Commissioning of Filter Press • Installation and commissioning of Continuous Dryer • Revamping of 356 KW Steam Turbine

S
Site Incharge Instrumentation 15.05.2009 - 25.02.2010
Shri Instruments Thane, Maharashtra

Project Site: Kudan Kulam Nuclear Power Plant, Kudankulam, TN Designation : Site In-Charge Responsibilities: • Planning and execution of Project. • Participate in business meeting with clients, consultants and sub contractors discussing scope of work, work progress, scope clarifications etc. • Preparation of daily/weekly progress reports and all types of charts • Site Administration. • Preparation of BOQ and Cost estimates. • Estimation and Billing work. • Material/vendor selection, evaluation of prices, preparing purchase order and follow up the vendors. • Inspection and acceptance testing for procured materials. • Working as per EHS/SHE norms. • Installation of DCS, PLC. • Installation of various field instruments and panels. • Installation of Gas analyzers. • Laying of Cable trays, impulse/ pneumatic piping work. • Cable laying,glanding,termination work. • Panel wiring. • Calibration of all types of field Instruments, analyzers, indicating instrument etc. • Loop checking and Commissioning. • Installation of F & G System.

S
Site Incharge Instrumentation 01.11.2008 - 30.04.2009
Miraj Instruments Services Pvt. Ltd., Thane, Maharashtra

Project Site: BPCL Refinery, Mumbai, Shut Down Designation : Site In-Charge Responsibilities: • Planning and execution of Project. • Participate in business meeting with clients, consultants and sub contractors discussing scope of work, work progress, scope clarifications etc. • Preparation of daily/weekly progress reports and all types of charts • Site Administration. • Preparation of BOQ and Cost estimates. • Estimation and Billing work. • Material/vendor selection, evaluation of prices, preparing purchase order and follow up the vendors. • Inspection and acceptance testing for procured materials. • Working as per EHS/SHE norms. • Installation of DCS, PLC. • Installation of various field instruments and panels. • Installation of Gas analyzers. • Laying of Cable trays, impulse/ pneumatic piping work. • Cable laying,glanding,termination work. • Panel wiring. • Calibration of all types of field Instruments, analyzers, indicating instrument etc. • Loop checking and Commissioning. • Installation of F & G System.

S
Site Incharge Instrumentation 15.01.2008 - 25.09.2008
Hyperion IT Pvt. Ltd., Chennai,Tamilnadu

Project Site: Relen Relocation Plant, IPCL, Bharuch, Gujrat Designation : Site In-Charge Responsibilities: • Planning and execution of Project. • Participate in business meeting with clients, consultants and sub contractors discussing scope of work, work progress, scope clarifications etc. • Preparation of daily/weekly progress reports and all types of charts • Site Administration. • Preparation of BOQ and Cost estimates. • Estimation and Billing work. • Material/vendor selection, evaluation of prices, preparing purchase order and follow up the vendors. • Inspection and acceptance testing for procured materials. • Working as per EHS/SHE norms. • Installation of DCS, PLC. • Installation of various field instruments and panels. • Installation of Gas analyzers. • Laying of Cable trays, impulse/ pneumatic piping work. • Cable laying,glanding,termination work. • Panel wiring. • Calibration of all types of field Instruments, analyzers, indicating instrument etc. • Loop checking and Commissioning. • Installation of F & G System.

S
Site Incharge Instrumentation 05.02.2007 - 05.01.2008
Miraj Instruments Services Pvt. Ltd., Thane, Maharashtra

Project Site: Feb’07-Jul’07 RCF, Mumbai (Ammonia V Plant Revamping and Honeywell DCS CPS 3000 Commissioning) Aug’07-Jan’08 Reliance (JERP) Refinery, Jamnagar, Gujrat Responsibilities: • Planning and execution of Project. • Participate in business meeting with clients, consultants and sub contractors discussing scope of work, work progress, scope clarifications etc. • Preparation of daily/weekly progress reports and all types of charts • Site Administration. • Preparation of BOQ and Cost estimates. • Estimation and Billing work. • Material/vendor selection, evaluation of prices, preparing purchase order and follow up the vendors. • Inspection and acceptance testing for procured materials. • Working as per EHS/SHE norms. • Installation of DCS, PLC. • Installation of various field instruments and panels. • Installation of Gas analyzers. • Laying of Cable trays, impulse/ pneumatic piping work. • Cable laying,glanding,termination work. • Panel wiring. • Calibration of all types of field Instruments, analyzers, indicating instrument etc. • Loop checking and Commissioning. • Installation of F & G System.

S
Site Engineer Instrumentation 03.10.2005 - 28.01.2007
PCT (I) Pvt. Ltd., Thane,Maharashtra

Project Site: Essar Refinery, Jamnagar, Gujrat Designation : Instrumentation Engineer Responsibilities: • Planning and execution of Project. • Participate in business meeting with clients, consultants and sub contractors discussing scope of work, work progress, scope clarifications etc. • Preparation of daily/weekly progress reports and all types of charts • Site Administration. • Preparation of BOQ and Cost estimates. • Estimation and Billing work. • Material/vendor selection, evaluation of prices, preparing purchase order and follow up the vendors. • Inspection and acceptance testing for procured materials. • Working as per EHS/SHE norms. • Installation of DCS, PLC. • Installation of various field instruments and panels. • Installation of Gas analyzers. • Laying of Cable trays, impulse/ pneumatic piping work. • Cable laying,glanding,termination work. • Panel wiring. • Calibration of all types of field Instruments, analyzers, indicating instrument etc. • Loop checking and Commissioning. • Installation of F & G System.

I
Instrumentation Engineer 05.08.2002 - 25.09.2005
Dhavir Instruments Pvt. Ltd., Dhatav, Roha.Dist-Raigad,Maharashtra.

Aug’02-Jan’05 Maintenance Site: Sudarshan Chemical Industries Ltd. Dhatav, Roha-Maharashtra Designation : Instrument Engineer Feb’05-Sep’05 Project Site: Methyl Amine Expansion plant, RCF, Thal, Alibag, Maharashtra Designation : Instrument Engineer Responsibilities: • Preventive maintenance of various Instruments. • Calibration of all Instruments • Break down jobs. • Installation, Removing, Replacements of various Instruments. • Cable laying, Glanding, Termination. • Regular maintenance of Control valve, on-off valve. • Support work to ISO, 5S system. • Working, Trouble shooting of AC Drive. • Calibration and Maintenance of Electronic Weighing System. • Working on all types of Instrument Switches.

Skills

DCS
100%
PLC
100%
VFD
100%
Calibration
100%
Instrument Maintenance
98%
ISO Documentation
100%
Instrument Detailing
100%
Instrument Selection
100%
Vendor quotation and negotiation
100%
Safety and Environment
100%
Projects and Commissioning
100%
Panel wiring
100%
GMP
100%
Team leader
100%

Be the first to review “Yoges Bapuji Mhatre”

Your Rating for this listing