Anil Yashavant Bhokate

About Candidate

Location

Education

B
B.E. Instrumentation Engineering. 2021 to 2024
Maharshi Parshuram Collage of Engineering ( VPM's )

I have completed B.E. in Instrumentation Engineering with 1st. class.

D
Diploma in Instrumentation Engineering 2002
Dr. Babasaheb Ambedkar Technological University Lonere.

I have completed Diploma in Instrumentation Engineering with 2nd class.

Work & Experience

S
SR Executive Engineering 15 Dec.2023 - Till date
Relience Life Sciences Pvt. Ltd.

Looking after Maintenance management, Project Management, Manpower management, Material management,

S
SR Executive Instrumentation Aug. 2023 - Dec. 2023
Excel Industries Limited.

Looking after Instrumentation maintenance, preventive maintenance, Regular planed calibration activity, Material procurement. process instrumentation Improvement management.

A
Assistant Manager Improvement and Process Engineering instrumentation. Aug. 2018 - Aug. 2023
Keva Fragrances Pvt. Ltd.

Assistant Manager Instrumentation improvement & process Engineering Since 2020. SR Executive Instrumentation Improvement & process Engineering Since 2018 to 2019 Worked on Greenfield project of Aroma (Tonalid) Having Honeywell DCS system C300. 2100 I/O. 15 Remote I/O Rstahl make. Utility Department- Boiler 6TPH, Chilling Plant, brine plant(125 TR, 60 TR ) Instrument air compressor, Air dryer, Thermo pack Instrumentation side maintenance handling Chicago. Nitrogen Plant. Maintenance of Telephone system Alcatel Achievements :- 1) “ Execution excellence Award in 2022, 2) “COVID HERO” Award winner in 2020, 3) “KEVA STAR” Award winner in 2019, 4) “Innovation Excellence Award” FY 2018-2019.

E
Executive Instrumentation Oct. 2008 - Aug. 2018
Sudarshan Chemical Industries Ltd. Roha plant

● Upgraded 15 nos. SCADA systems of Indusoft webstudio V6.1 & saved 15 Lacs. ● Worked on Greenfield project of New Azo Pigment manufacturing plant having capacity of 200 TPM & Cosmetic manufacturing plant. Handled the erection & commissioning of Schneider Electric PLC (Premium), Indusoft Web studio SCADA for Sumicos cosmetic Mica Plant. ● Worked on 8.4 mega watt power plant ( DCS – Honeywell ). (Triveni) ● IMS audit related documentation work. ● 5S system maintaining & implementation, monthly audit.

G
Group Leader Instrumentation Dec 2007 - Sept 2008
India Gypsum Limited. Wada Plant.

Looking after Instrumentation maintenance. Preventive maintenance and calibration activity.

A
Assistant Engineer Instrumentation Dec. 2006 - Aug.2007
Gharda Chemicals Limited. Dombivali plant.

Worked on Greenfield project of Fipronil product plant. Automation system having GE Fanuc PLC & SVADA system. ● Handling the Detailing & procurement of instrumentation & its spares. ● Reviewing of P & ID drawings, instrument specifications, hook up diagrams, instrument data sheet & instruments loop drawing. ● Loop checking of all field mounted instruments. ● Calibration, configuration & maintenance of smart level, pressure & temperature transmitters, flow meter with HART Communicator- Yokogawa YHC 4150. ● Checking, removing & restoring interlocks.

S
Supervisor Instrumentation. Nov 2002 - Dec 2006
Deepak Nitrite Limited

Instrumentation Supervisor since 2004 to 2006, Trainee Instrument Engineer since 2003, Apprenticeship Engineer since 2002. ISO documentation work including instruments calibration report, preventive maintenance & Calibration, History report generation for the same. ● Utility Department- Boiler, Chilling Plant Ice plant(125 TR, 60 TR, 30 TR 80TPD) ● Instrument air compressor, Air dryer, Thermo pack Instrumentation side maintenance handling – Chicago. ● Maintenance of Telephone system Intelicon DS200 ● Maintenance of fire alarm system. – Nishko instrument ● Maintenance of Person addressing system. – master control desk ● Weighing balances calibration & stamping through Weights & measure.

Awards

1
1)“ Execution excellence Award in 2022, 2022
I have re-setup plant which was under flood water within 26 days with instrumentation repair new instrument procurement and installation activity. I have re-setup plant which was under flood water within 26 days with Electrical equipment repair new instrument procurement and installation activity.
C
COVID HERO” Award winner 2020
Keeps plant activity run in Covid lock down, Provided instrmentation and Electrical service 24/7 availability.
K
KEVA STAR” Award winner. 2019
Performed best of my carrier for plant project and Instrumentation maintenance as well as Electrical maintenance activity. made 100 % plant availability for production target with minimum budget.
I
Innovation Excellence Award. FY 2018-2019.
Project erection and commissioning completed within 3 months duration. and achieved production target of plant capacity by improving Instrumentation control loop and process recipe modification work. Programing of Honeywell DCS to made changes for process requirement time to time. Achieved 102 Ton production target oriented.
G
Good Job Done. 2017
● Upgraded 15 nos. SCADA systems of Indusoft webstudio V6.1 & saved 15 Lacs